Please provide a status report on the replacement of auditorium light bulbs and the flooring issues at Springbrook High School.

Question#: 13

ANSWER:

The current lighting system and its lighting levels in the auditorium at Springbrook High School were originally designed as performance assembly space. However, the school occasionally uses the auditorium for testing purposes which requires a much higher lighting level.  Replacement of the lighting system in the auditorium is estimated to cost approximately $100,000. The replacement of the lighting system in the auditorium and resurfacing of the wood floor in the gymnasium will be scheduled in the Planned Lifecycle Asset Replacement program in the FY 2021 Capital Improvements Program Budget.